Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13641268

- Product Categories
- Friendly Links
- home > Supply > The price of the secondary structure of the second casting machine casting machine manufacturer
Information Name: | The price of the secondary structure of the second casting machine casting machine manufacturer |
Published: | 2015-06-24 |
Validity: | 300 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | The price of the secondary structure of the second casting machine casting machine casting machine manufacturer to specifically address the secondary structure of the secondary structure construction and labor, laborious, low production efficiency. The aircraft are small, simple, easy to move, high efficiency, reduce labor intensity, flexibility to construction in the floor, you can close lintels, pillars etc. secondary institutions pouring casting machine parameters Product name: SA-3000 type II secondary structure dedicated casting machine Model: 3000 ???? production capacity: 1Min / m ???? motor power: 5.5kw Dimensions mm (length X width X height): 1000X800X2850mm casting machine Note: 1. If reaming often card dead for the groove with a loose, to adjust to the tension level. 2. The power supply must have a reliable grounding and electrical leakage protection device Note Do not pour me playing gray water or wet hands. 3. reaming stuck, start at the reversal, then Story run. 4. Do not pay attention to two universal bearing topped ash, weekly bearings butter filling. 5. masturbating highly available random distribution joint adjustment, the adjustment should be installed in the bell connection. Click here detailed method of operation of the secondary structure of casting machine, we want to help. 1. Check the appearance of the machine, whether due to machine damage caused by long-distance transport, especially in the electrical box electrical wires without loss. 2. Turn the power to do grounding protection equipment enclosure. Start at the motor, see if you can work properly. 3. into the hopper, according to the construction height and angle of the insert 1 m or 0.5 m twisted cage, according to the angle of the junction of the vertical blade helix angle alignment. Then install the ash outlet. Last locking buckle. 4.4 Ridge reaming. (Twisted cage height should be higher than necessary to Nicholls pouring columns or lintel height) is pushed to the point of construction, the ash outlet hose out into the pillar into the gray hole. 5. should be started first with dilute wet ash pipe, the pipe will export more than ash. Then wash the hopper, gray tubes clean. |
Admin>>>
You are the 20023 visitor
Copyright © GuangDong ICP No. 10089450, Ji Ning Saao Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 20023 visitor
Copyright © GuangDong ICP No. 10089450, Ji Ning Saao Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility